A 3 × 3 m patio, 10 cm thick
0.9 m³, or 0.99 m³ with 10% waste (about 1.29 cubic yards) — 59 bags of 80 lb.
Work out how much concrete a slab, footing or round column needs, in cubic metres, cubic yards and bags.
Enter your values and select Calculate to see the result.
Enter your values and select Calculate to see the result.
Runs in your browser — nothing you enter is sent to a server.
Choose a rectangular slab, footing or wall, or a round column or post hole, and enter its size in metric or US units. The calculator works out the volume, adds a waste allowance for spillage and uneven ground (10% by default), and converts it to cubic metres, cubic yards and bags of premixed concrete.
volume = length × width × thickness × (1 + waste)
volume = π × (diameter ÷ 2)² × height × (1 + waste)
bags = volume in ft³ ÷ bag yield (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³)
0.9 m³, or 0.99 m³ with 10% waste (about 1.29 cubic yards) — 59 bags of 80 lb.
About 1.36 cubic yards with 10% waste, or 62 bags of 80 lb.
Bags suit small jobs; above about 1 cubic yard (0.75 m³), ready-mix delivered by truck is usually easier and cheaper.
Around 4 in (10 cm) for patios and paths, and thicker for driveways and heavy loads — check local requirements.
Forms bulge, ground is uneven and some concrete is always left in the mixer. Running short mid-pour is worse than a little left over.
Good to know
Estimates for planning. Follow local building codes and the manufacturer's instructions, and use a qualified professional for structural or electrical work.
Work out the volume, weight and bags of gravel, sand, topsoil or mulch for an area.
Construction Tools
Estimate the bricks for a wall in UK or US brick sizes, allowing for mortar joints, openings and waste.
Construction Tools
Convert liters, milliliters, US and UK gallons, cups, fluid ounces, spoons and cubic units.
Converters