Study Schedule Planner

Build a deadline-aware study schedule from subject workloads and daily capacity, with explicit unscheduled work and unused-time reporting.

Subject | required whole minutes | inclusive deadline (YYYY-MM-DD). All work is available at the start.

Date | available whole minutes. Each date appears once; up to 1,440 minutes/day.

Preparing calculator controls…

Results

Enter your inputs and calculate to see the result.

Runs in your browser — nothing you enter is sent to a server.

How the Study Schedule Planner works

This deterministic earliest-deadline-first planner splits tasks into whole-minute blocks. Deadlines include the entire named calendar date; study cannot be assigned after a subject deadline. Equal deadlines break ties alphabetically.

Build a deadline-aware study schedule from subject workloads and daily capacity, with explicit unscheduled work and unused-time reporting.

Formula

For each date in order, assign min(remaining daily capacity, remaining task minutes), earliest eligible deadline first.

All subjects are assumed available before the first slot. This is a capacity worksheet, not a promise of learning outcomes or a non-preemptive scheduling optimizer. It does not add breaks, travel, release dates or revision spacing. Missing capacity is reported, never hidden.

Examples

Feasible workload

Algebra needs 90 minutes by Nov 13 and History needs 60 by Nov 14. Three 60-minute slots on Nov 12–14 schedule all 150 minutes and leave 30 minutes free.

A missed deadline

A 90-minute subject due Nov 13 with only 60 minutes available on Nov 14 has zero scheduled minutes and 90 unscheduled minutes.

Frequently asked questions

What does this calculation assume?

This deterministic earliest-deadline-first planner splits tasks into whole-minute blocks. Deadlines include the entire named calendar date; study cannot be assigned after a subject deadline. Equal deadlines break ties alphabetically.

Which limitations matter for this tool?

All subjects are assumed available before the first slot. This is a capacity worksheet, not a promise of learning outcomes or a non-preemptive scheduling optimizer. It does not add breaks, travel, release dates or revision spacing. Missing capacity is reported, never hidden.

How can I check the result?

Algebra needs 90 minutes by Nov 13 and History needs 60 by Nov 14. Three 60-minute slots on Nov 12–14 schedule all 150 minutes and leave 30 minutes free. Compare this worked case before using your own inputs.

Information:

Good to know

All subjects are assumed available before the first slot. This is a capacity worksheet, not a promise of learning outcomes or a non-preemptive scheduling optimizer. It does not add breaks, travel, release dates or revision spacing. Missing capacity is reported, never hidden.

Reference: Cornell Learning Strategies Center: time management. The implementation scope and conventions above are authoritative for this worksheet.

Pomodoro Timer

Work in focused 25-minute sessions with short breaks and a longer break every fourth session.